Built on three decades of pipeline leadership experience, we execute high-pressure, low-pressure, and gravity pipeline networks, heavy civil infrastructure, industrial tank fabrication, LV cable laying and MCC terminations, and nationwide heavy equipment operations across Pakistan.
Marvel Engineering (Pvt.) Ltd. is a multi-disciplinary EPC contractor and sister concern of A.U. Engineering & Construction (Pvt.) Limited. Established in 2020, we are led by professionals with over three decades of experience in Pakistan’s oil, gas and energy sectors — delivering cross-country pipelines, heavy civil works, industrial fabrication, and E&I solutions with safety, quality, and on-time execution.
Turnkey pipeline, civil, fabrication, and E&I execution, backed by our own fabrication yards in Karachi and Thar and a dedicated heavy-haulage fleet.
Cross-Country & Industrial Piping Infrastructure
Preparation of Right of Way, trenching, stringing, field-bending, welding, lowering-in, pigging and hydrotesting for pressure pipelines, and jointing and commissioning for HDPE and RCC gravity networks.
Workshop & Field Heavy Steel Fabrication
Precision steel fabrication executed across our strategic yards in Karachi (Korangi/Sohrab) and Tharparkar (Islamkot) to accelerate on-site assembly.
Heavy Civil Works & Plant Facilities
Earthworks, structural foundations and specialised site infrastructure engineered to withstand harsh industrial and geological environments.
Low-Voltage Power & Field Instrumentation
Field cabling, tray installation, equipment connection and termination services for industrial plants and pumping stations.
Nationwide Transport, Heavy Haulage & Field Equipment
Fleet management and heavy haulage infrastructure ensuring rapid mobilisation and reliable material logistics across complex project terrains, for our own projects and third-party clients.
A selection of our recently completed and ongoing work.
| Client | Project Scope | Key Disciplines | Year | Status |
|---|---|---|---|---|
| Engro (Engro Powergen Thar Limited) | 30" Dia x 18 KM MS Water Pipeline & Pumping Station at Vajihar, Thar Coal Block-II | High-Pressure Steel Pipeline Construction | 2018–2019 | Completed |
| Thar Energy Limited / ThalNova Power Thar | Effluent Disposal Scheme (EDS) — design, civil, mechanical & E&I works at Thar Coal Field | Turnkey EPC, HDPE Evaporation Ponds | 2021–2022 | Completed |
| The Hub Power Company Limited (HUBCO) | 24" Dia MS Water Pipeline, 36 KM long, plus all civil/mechanical/E&I works of pumping station at Thar Coal Field | Cross-Country Pipeline, Civil Construction | 2022 | Completed |
| HUBCO / BYD (Mega Motors Company) | 8,000 RFT boundary wall including 6 watchtowers at Gharo | Civil Earthworks, Security Infrastructure | 2025 | Completed |