Projects & Track Record

A selection of completed and ongoing work for Pakistan's leading energy, power, and industrial clients.

Case Studies

Client & Project Summary

Client Project Scope Key Disciplines Year Status
Engro (Engro Powergen Thar Limited) 30" Dia x 18 KM MS Water Pipeline & Pumping Station at Vajihar, Thar Coal Block-II High-Pressure Steel Pipeline Construction 2018–2019 Completed
Thar Energy Limited / ThalNova Power Thar Effluent Disposal Scheme (EDS) — design, civil, mechanical & E&I works at Thar Coal Field Turnkey EPC, HDPE Evaporation Ponds 2021–2022 Completed
The Hub Power Company Limited (HUBCO) 24" Dia MS Water Pipeline, 36 KM long, plus all civil/mechanical/E&I works of pumping station at Thar Coal Field Cross-Country Pipeline, Civil Construction 2022 Completed
HUBCO / BYD (Mega Motors Company) 8,000 RFT boundary wall including 6 watchtowers at Gharo Civil Earthworks, Security Infrastructure 2025 Completed
Sindh Engro Coal Mining Company (SECMC) 5 KM Inner Cordon Fence including 4 watchtowers Civil Underground Drainage, Security Infrastructure 2024 Completed
Sino Sindh Resources 40" Dia, 37.5 KM MS water pipeline at Thar Coal Block-I Large-Diameter Cross-Country Pipeline Construction Ongoing Ongoing
United Energy Pakistan Limited (UEPL) Various oil/gas pipelines (supplement works) Pipeline Construction & Maintenance 2015–2022 Completed
China Machinery Engineering Company (CMEC) 12" Dia various HDPE pipelines from plant to re-injection wells, Thar Coal Block-II Specialized HDPE Piping & Fluid Management 2017–2018 Completed
Jamshoro Joint Venture Limited (JJVL) Rehabilitation works at LPG Extraction Plant, Jamshoro Plant Maintenance, Mechanical & Piping Overhaul Recent Completed
From The Field

Project Gallery

Pipeline construction, civil works, and fabrication across our project sites.

Trusted By

Clients We’ve Delivered For

Have a project in mind?

Tell our engineers about your pipeline, civil, or fabrication scope and get a response fast.

Contact Our Engineers ›